Ha also if you have 175 psi instead of the 90 recommended
Sent from my C811 4G using Tapatalk
Crew when needed /A&P mostly though i do same thing sit around all day wait for them to get back do the daily than go home did a 25hr today have a 300hr coming up with lots of tbo goodies working on 212's in Afghanistan pm me if you're looking for work and have A&P we're looking :thumb:
Got done milling on the thick blocks and sent them to the lathe. Put the 4 jaw chuck inside the 3 jaw chuck to make round. Customer wanted them split but didn't want a gap in the middle so we had to make them 2 piece. The big ones finish @ 14" long X 6.500" O.D. The small ones are 6.5" O.D. X 4.375" long.
nice work i hated putting my 4 jaw in my 3 jaw seen to many horror stories but sometimes its the only way
That 4 jaw goes on our small lathe and the big lathe doesn't have a 4 jaw. Compromise, lol.
Got 355k on axle and 100k on the 4.56 Yukon's I put in last year