Well I still haven't made any progress on the engine. Hopefully get things going on it in a month.
Did get some parts off the floor for the truck. Installed a FASS, dropped and cleaned the fuel tank along with getting rid of 15gal of 2 y/o diesel, installed a new Carter pump off the slip tank and will have a new filter base and filter mounted for it tomorrow.
I still need to hook the webasto fuel line into the inlet to the FASS which I forgot to do.
Then it's on to wiring in the power for the Carter, FASS, running wires for the DSP 5 which I have had for 5 years and never installed as well as the wiring for an engine oil temp gauge.
Then it's back to work for 2 or 3 weeks.