Engine build

jliddle

New member
Jun 30, 2012
331
0
0
NC
Yep. Latest forecast says partly cloudy.

I was gonna be there both days but looks like it'll just be Saturday for me now.
 

minerigger

Active member
Dec 24, 2013
2,660
1
38
Casper, WY
I don't blame you one bit. Your had a tough road with that to get where it is and to finally be able to take it to a nearby evet and it does that

Sent from my SM-G900V using Tapatalk
 

moparkxracer

Well-known member
Jun 25, 2010
2,309
33
48
Out and about
Mishimoto warrantied the radiator the new one should be here Wednesday. Just need to get the an fittings welded to the new one. Also want to change out my driver side boost tube to 3.5 inch. We did 3.5 on the passenger side when the kit was built, I have most of the stuff to do it, just need to get it in the calender at shade tree triples.
 
Last edited:

moparkxracer

Well-known member
Jun 25, 2010
2,309
33
48
Out and about
Radiator is ready to go back in, had the fittings welded on it today. Talked to Landon abt doing the new boost tube this weekend should be a productive weekend.
 

Lb7_Katie

Lb7 Duramax
Sep 8, 2013
851
31
28
34
picture.php



God this thing is beyond sexy
 

moparkxracer

Well-known member
Jun 25, 2010
2,309
33
48
Out and about
We got the boost pipe done, need to get it to the powder coater. With the bigger pipe we had to roll it forward some. Thank you Landon for all the help!!!

picture.php
picture.php