What did you do at work today?

jlawles2

Well-known member
Jan 28, 2010
1,057
39
48
Danbury, TX
Got into a big argument with my boss over overtime hours today. They want us under 9.5/hr day, yet continue to dispatch us with more work than that, then put the onus on us when we're over the new made-up "goal".
Im just not going to tolerate being pressured and pushed to work faster and less safely like some rookie. Ain't gonna happen.

Ask one of the supers to prove they can do it while following the rules. Otherwise, tell them when you hit 9 its back to the center to avoid breaking the 9.5hr max imposed rule (unless its more than .5 ht back to the center), and they can deliver the rest of the packages, and make sure they do not break 9.5 hrs to get the OT otherwise you can claim the Me2 clause and get paid to sit at home drinking beer. :D

Take it up with the local on site union rep (steward?) and if that gets you no where call the BA and file a grievance.

Crappy way to deal with them, but sometimes its what it takes for them to realize they have unobtainable goals.
 
Feb 2, 2019
93
0
6
33
Utah
Yeah I feel that I’m working an extra 80 hours this week due to convention being taken town tomorrow but hey who can butch about $35 an hour plus overtime and preduum


2003 LB7

EFI LIVE
CAT FUEL FILTER
5 inch flo~pro
Sitting on 33*12.5-44 ballistic 959/Atturos
 

hbomb

New member
Feb 21, 2019
3
0
0
I supervised the installation of controls and valving for the upgrade to the heating and cooling system at a local high school, NIGHT SHIFT!!! YAY
 

Pure Diesel

Active member
Apr 22, 2008
893
150
43
Ventura County
Well I've been at my new job 7 months and love it. Passed probation. Now studying to be a Reg 4 tester for the district. Test is next month and if I pass everything that's a 5-1/2% differential pay increase. Our union also agreed to the new contract. That means 3% back pay for 7 months and come July 1st a $6/hr.raise also. Can't get any better than this right now. Great group of people in the department that I work in.
 
Feb 2, 2019
93
0
6
33
Utah
ded8227a526d291ded247dd646ad1629.jpg


Played in the snow



2003 LB7

EFI LIVE
CAT FUEL FILTER
5 inch flo~pro
Sitting on 33*12.5-44 ballistic 959/Atturos
 

ironmax

chock full of goodies
Jul 7, 2010
502
27
28
Col. Ohio
No pics, but a good day out with some friends at a hunt club we all worked at growing up. Shot some birds,bunnies, and the shit for a few hours. Our old boss is still working it every day, it was a cool place to work, and a lot of interesting people to talk to.

Sent from my SM-J337A using Tapatalk
 

TheBac

Why do I keep doing this?
Staff member
Apr 19, 2008
15,610
1,865
113
Mid Michigan
Woke up at 6am, got ready for work, shoveled the driveway, then went into ups.

Drove around in the snow out in the country for 10 hours, actually had some fun doing it.

Then stopped by Mom's house on the way home to get the mail and shovel the driveway (so it looks like someone's home).

Got home at 8pm. Just another day....
 

Dozerboy

Well-known member
Jun 23, 2009
4,892
470
83
TX of course
Set 88 sq ft floor tile and 100sq ft on shower walls today








Man I wish I could knock it out like that. I’d go broke if I was a tile guy. I’m doing good doing 90sf a day at my house. After doing that on Saturday and Sunday I’m ready to go back to work on Monday and take it easy.


Sent from my iPad using Tapatalk
 

SmokeShow

Well-known member
Nov 30, 2006
6,818
34
48
43
Lawrenceburg, KY
I can lay the tile satisfactory for me but I cannot get the technique down pat for doing the grout. It stays too wet in the gap so when I sponge it, it gets squeezed around and looks like assss (Admittedly, I am a perfectionist). If I let it set enough, the shit skimmed on the tile won't come off with just a sponge. Drives me nuts.
 

Josh154

Well-known member
Sep 28, 2015
1,220
85
48
Sioux Falls SD
Man I wish I could knock it out like that. I’d go broke if I was a tile guy. I’m doing good doing 90sf a day at my house. After doing that on Saturday and Sunday I’m ready to go back to work on Monday and take it easy.


Sent from my iPad using Tapatalk

Lol you wouldn’t go broke. 90 sq ft is still a good day, going rate is $5 per ft just to set floors here. Have 50 cents per ft in mortar and grout, still have a $400 day! When you do it everyday for the past 6 years speed comes with it. I can honestly say I love my job, stuck with it ever since high school and glad I did. It’s a trade that doesn’t require apprentice hours or any testing. As long as you know what your doing and confident in it your good

I can lay the tile satisfactory for me but I cannot get the technique down pat for doing the grout. It stays too wet in the gap so when I sponge it, it gets squeezed around and looks like assss (Admittedly, I am a perfectionist). If I let it set enough, the shit skimmed on the tile won't come off with just a sponge. Drives me nuts.

Sounds like your mix is a little wet. Are you using sanded or unsanded grout?
 

malibu795

misspeelleerr
Apr 28, 2007
8,231
548
113
42
in the buckeye state
finally got my but in gear and fixed/upgraded my steel Kauffman trailer... been needing new hangers and its tracked right couple inches since Kauffman did warranty work 8 month after I bought it... also aligned it.. and two new springs
2 100' laser levels
51822079_10217026670712522_8836561509740969984_n.jpg

plumb line and I leveled the trailer left to right with an angle finder.. and found center between the two laser dots.. Kaufman builds the running gear on a sub frame then welds the sub frame to the I-beam.. found the welded the DS 5/8" too far forward.. thrust center line was roughly 5" to the PS at the plumb line.. I didnt bother to check alignment between the two axles
51975519_10217026670912527_4823642392491982848_n.jpg

someone bent a spindle at some point... was used around the farm for a while.. ive only over loaded it twice in 7 years ive owned it and it got promptly unloaded...
52527199_10217080576100123_564997793828044800_n.jpg

53150316_10217143901483218_242572498678317056_o.jpg

bought new 82/64 axle that was complete.. and stripped it for the beam, faster and cheaper than waiting for a beam to get made and shipped..
3 different styles of 4,000lb leaf springs.. middle one matched the front... top have 3/4" OD nylon bushing that don't last. bottom one came with the axle.. has a steel sleeve and rubber bushing.. doesn't match the front springs..
53167534_10217143904883303_13632436650901504_o.jpg

it tracks straight and pulls a lot nicer now