Lbz build pictures along the way.

JDPlowboy

Member
Feb 6, 2011
624
0
16
34
Truck blew a hole in #7 piston, scored the block too deep so I'm starting with a fresh Lmm block. I just picked it back up from the machine shop today. The procedures the performed were

Oven baked and steam cleaned
Replaced cam bearings
Bored 20 over and torque honed
Pan rails, front/rear covers decked to match each other.
Crank bore was torque honed
New freeze and oil galley plugs
Rotating assembly balanced
Polished crank.
Blocks head surface decked

I'll post pictures as I go along, build is consisting of:

Socal girdle and main studs
ATI dampner
Socal billet flexplate
Carrillo rods
Diamond billet Pistons 17:1
SoCal 3388AF
Merchant heavy duty push rods
SoCal beehive valve springs and cups
Arp head studs

a2cfb4aba9b460f30e777cd83004ea27.jpg
47e2550466d06620b0db60282b65b645.jpg
0a8d18484a6be327138479fda936b60c.jpg
f953088d7f1889fc5346992c416ccb8c.jpg
 

Hot COCOAL

May the farce be with you
Jun 9, 2012
4,433
0
0
That's a cheap ass parts list, and they used to much assembly lube...you better start over...I'll take that useless stuff off your hands for ya:angel:

:thumb:

Never know whether to say to grats or sorry :eek:
Nevertheless, it looks like its gunna be AWESOME!
 

JDPlowboy

Member
Feb 6, 2011
624
0
16
34
0d1b894e1ab4a08519d243f663699ce6.jpg


Also had crank keyed yes, forgot that in the process list.

Cam comes Keyed

And for anyone wondering the machine shop bill was $3600... I think he got hosed on that deal but maybe not. They did a very thorough job and I'm confident with everything.
 

JDPlowboy

Member
Feb 6, 2011
624
0
16
34
That's a cheap ass parts list, and they used to much assembly lube...you better start over...I'll take that useless stuff off your hands for ya:angel:



:thumb:



Never know whether to say to grats or sorry :eek:

Nevertheless, it looks like its gunna be AWESOME!


Sorry I used too much lube for your taste lol
 

Ne-max

I like turtles
Nov 15, 2011
3,361
64
48
Lincoln, Ne
3600 is ridicules. Mine cost 1200 to bore .20 over, align hone, deck block and heads, cut crank keys, install cam bearings, go through heads with new seals and springs, balance rotating assembley.
 

catman3126

Ehhh?.... You don't say?
Jul 24, 2012
2,636
0
36
NE Oregon
2350$ for machine shop bill on my short block. that was cleaned, honed.020 over, pistons hung on rods, balanced, line bored, Keyed the crank, and assembled, then deg checked the cam