Wireing is done and the engine is in. I put the throttle pedal and base mount in too. After lunch I'll be hookin up the wireing to the engine and installing the alts. Then will be the trans, front stack ect..
Wireing is done and the engine is in. I put the throttle pedal and base mount in too. After lunch I'll be hookin up the wireing to the engine and installing the alts. Then will be the trans, front stack ect..
Just got back from the test flight.. The LBZ/6speed are runnin sweet!!!!
STFU And happy for me hooker.