actually a cubic meter is more then a cubic yard. there is 1.31 cubic yards in one meter. so 35.?? cubic feet in a cubic meter and 27 cubic feet in a yard. so 7.7 cubic meters is roughly the same volume as 10 cubic yards. You're still getting hosed though lol.
6k ?? u sure.... poured about 1000 yards on job last summer (waste treatment plant) and it was all 4k, few times we had to special order it that was 4500 (under generator and large pumps) oh and we had about 80k in rebar on the job, 2 tractor trailers full of it