In 2007, I had my local authorized ATS builder build me a stage 1. That lasted until October of 2009.
Then I purchased the Stage 1 built by ATS—installed & done October 29, 2009.
Keep in mind I’m running the 60hp Predator tune & this is my 2005 Sierra daily driver.
August 1 of this year, it’s shifting erratically & limps, so I take it in. Shift Solenoid E needs to be replaced. I have to pay the shop & try to get my money directly back from ATS because they haven’t been paying him for warranty work(according to him). They still have not reimbursed me the $600 I paid for this repair.
August 16 of this year(ten days after I get it back), the same thing happens. I have it towed back to the shop 7 I get it back on September 17—they replaced the valve body twice during this time period. ATS pays the shop directly.
Today it shutters, limps, and then won’t move forward. I’m currently waiting for the tow truck.
At this point, a brand new, full-warranty transmission has cost me: $600 for the covered repair, $300 in towing, $1,500 in car rental for a total of $2,400.
And now it has to go back.
Any suggestions?
Then I purchased the Stage 1 built by ATS—installed & done October 29, 2009.
Keep in mind I’m running the 60hp Predator tune & this is my 2005 Sierra daily driver.
August 1 of this year, it’s shifting erratically & limps, so I take it in. Shift Solenoid E needs to be replaced. I have to pay the shop & try to get my money directly back from ATS because they haven’t been paying him for warranty work(according to him). They still have not reimbursed me the $600 I paid for this repair.
August 16 of this year(ten days after I get it back), the same thing happens. I have it towed back to the shop 7 I get it back on September 17—they replaced the valve body twice during this time period. ATS pays the shop directly.
Today it shutters, limps, and then won’t move forward. I’m currently waiting for the tow truck.
At this point, a brand new, full-warranty transmission has cost me: $600 for the covered repair, $300 in towing, $1,500 in car rental for a total of $2,400.
And now it has to go back.
Any suggestions?